Applying P-chart to the Periodic Yield view

Comments

2 comments

  • Official comment
    Ola Lund Reppe

    Hi Amir, I am not exactly sure what you mewan, as yield metrics in WATS does not have any lower or upper specification limits. The functionality you are describing is more relevant for test step analysis, where one actually compares measurements against specified lower and upper limits.

    Can you please elaborate on how you mean this applies to the periodic yield charts, that shows yield for a products performance in a process, not measured values for a step with limits?

    Are you aware of the Test Step Analysis report and how to use it?

    Br
    Ola Reppe

    Comment actions Permalink
  • Amir Mousavian

    Hi Ola,

    What I'm talking about is showing the control limits on the chart below for the yellow trend line.

    Here is an example that I've recently used in my Lean Six Sigma project using Minitab to show how the FPY is improved.
    In test step analysis, I know what the spec limits are and how they are shown on the SPC charts on WATS.

    If you want, I can show you how to make it in Minitab on a call.

     

    BR,

    Amir Mousavian

    0
    Comment actions Permalink

Please sign in to leave a comment.