| Default User Level: | Manager |
| WATS cloud Availability: | Analytics, Enterprise |
A global sequence can be used as a sub sequence in several other test sequences, and may be very useful when you have more than one MI sequence that share a sequence of the same test steps. Instead of re-creating and configuring identical steps across sequences, you can easily configure a sub sequence that applies for all of them.
To make a sequence global, the sequence needs to have:
- a status of "Pending" or "Released.
- global turned on in the sequence overview tab.
Both of the above menitioned settings, can be set in the production manager after selecting a sequence.
When the desired sequence is set to global and has the correct state, it can be used when creating a sequence in the sequence designer.
To use it, drag and drop an item of the "Global Sequence" step type from the toolbox to the desired location. Then click the [...] button and select the sequence from the dropdown as shown below.
Comments
0 comments
Please sign in to leave a comment.