Enterprise Connection

Follow

Comments

2 comments

  • Jenny Gramdal

    Hi Adam,

    Yes, that is correct. Reports forwarded through an Enterprise connection will consume the data allowance of the destination WATS instance.

    For example, if Instance A is synchronizing reports to Instance B, the data allowance of Instance B needs to be sufficient to accommodate the incoming reports.

    1
    Comment actions Permalink
  • Adam Brookes

    How does data allowance work in relation to the Enterprise Connection feature? Does each report forwarded consume data allowance of the destination WATS instance?

    0
    Comment actions Permalink

Please sign in to leave a comment.